As part of its North American expansion, MAPEI awarded INFRA a project to renovate a portion of its existing production space and expand its facilities to accommodate a new line that will produce 30,000 tonnes per shift annually.

The new admixture production line will produce 7,000 tonnes per shift annually.

The expanded storage space will now allow for more efficient distribution of this entire production: an additional 4,715 m² (50,750 sq ft) has been added to the existing 11,892 m² (128,000 sq ft) occupied by the polymer plant, the R&D center of excellence for concrete construction, and the Canadian headquarters, all of which are also located on the site.

The existing electrical service limited the capacity of the machinery and equipment required for the new layout and expansion. A precise and detailed analysis allowed us to streamline the electrical distribution, thus enabling optimized power delivery.

Our mechanical and electrical teams performed the preliminary and detailed engineering for the MEP (Mechanical, Electrical, and Plumbing) project, as well as integrating access control requirements, providing support during the tendering process, and overseeing both the office and the construction site.

Cameleon - Agence Web

Sitemap

Conception fait par : Agence web JM